0

Joytale Training Leads for Dogs Padded Handle Long Line Dog Lead 5m 10m 15m 20m Long Leads for Dog Training and Tie Out Support Up to Dogs Under 45kg Black 10M 10M Black

 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 Shipping Fees for any Order
 

GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 

AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 

FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 
 

Joytale Training Leads for Dogs Padded Handle Long Line Dog Lead 5m 10m 15m 20m Long Leads for Dog Training and Tie Out Support Up to Dogs Under 45kg Black 10M 10M Black





Regular Price: US$49.99

Special Price US$34.99

Availability: In stock


Supplier: Joytale

Category: Pet Supplies Dogs Training & Behaviour Aids


INTERNATIONAL PRODUCT ONLY
We apologize for the inconvenience, as we are currently unable to ship this product within the USA.


Joytale Long Lead For Dog Training 5M 10M 15M 20M

long leash

Training Lead With Removable Padded Handle And Double Hook

long leash

Take Your Dog On A Trip And Have Fun!

long leash
tie out

Available In 4 Sizes For Your Different Needs

long leash for dogs

Dog Tie Out - Provide Your Dog Enough Space To Move In The Yard

dog tie out

Suitable For Training, Dailywalking ,Camping, Hiking, Swimming ,Beach, Backyard Playing

long leash


NO TANGLE - Both of the snap of this extra long leash for dogs outside is swivel-style, which is twisted resistant. PREMUIM CLIMBING ROPE - This long leash for dog training is created by sturdy climbing rope. This material is strong and abrasion resistant, making it an excellent material for training leash for dogs that pull. HEAVY DUTY CLIPS - Both the hooks of the long lead leash for dog training is made of alloy steel and it's rust resistant and durable. SEPARABLE DESIGN FOR MUTIL PURPOSE - With handle, this leash is an ideal dog training leash To remove the handle it is a good tie out cable for camping or backyard. PADDED HANDLE - The grip of this long line dog leash is neoprene padded which is soft and it can get your hand away from burning while training or playing.
 
Be Safe - We Directly Ship From Country of Origin
 
BE SAFE
WE ONLY SOURCE
FROM OFFICIAL SUPPLIERS
 
From United Kingdom
To International
In 5-10 Days
US$19.99 Shipping Fees for any Order
 

GRAND SELECTION

Think of it and most probably we have it among our grand selection of products!

 

AMAZING PRICES

Get ready for the amazing and best Supps prices ever!

 

FIXED RATE DELIVERY

Get your order anywhere on this planet within 5-10 days with a fixed rate of $19.99 (no matter the size of your order)

 

 

 
 
Verified Customers Reviews
My Cart
Item
Continue Shopping